Cloud Core Router, 8 x SFP+, 1 x Gigabit, RouterOS L6, 1U - MikroTik CCR1072-1G-8S+
Noul nostru router emblematic, CCR1072, este alimentat de un procesor Tilera cu 72 de nuclee, fiecare nucleu este tactat la 1GHz, iar pentru a utiliza pe deplin aceasta putere, CCR1072 este echipat cu opt porturi 10G SFP+ conectate independent si un singur port Ethernet in scopuri de management.
Unitatea este echipata cu RouterOS L6 instalat, memorie 16 GB RAM ECC, ecran tactil LCD color, doua surse de alimentare tip hotplug pentru redundanta, slot pentru carduri inteligente, microUSB, USB de dimensiune obisnuita, microSD si 2 sloturi M.2 pentru stocare suplimentara.
Datorita procesorului unic cu 72 de nuclee si porturilor care sunt conectate direct la procesor, CCR1072 este capabil sa produca peste 120 de milioane de pachete pe secunda.
Producator: Mikrotik
Dimensiuni: 443 x 315 x 44 mm
Greutate: 4400g
Procesor/Chip: TLR4-07280 1 GHz 72 nuclee
Capacitate stocare: 128 MB
Tip stocare: NAND
Sistem operare: RouterOS L6
Numar porturi: 8x 10G SFP+ (modulele SFP nu sunt incluse)
MTBF: 200.000 ore la 25°C
Alimentare: AC 100-240V
Consum: 125 W max
Temperatura de functionare: -20°C - 60°C
Memorie RAM: 16 GB
Altele: 1 x RJ45
"
(editeaza cu modulul Reconfortarea clientilor)
(editeaza cu modulul Reconfortarea clientilor)
(editeaza cu modulul Reconfortarea clientilor)
Order Delivery
Delivery terms and conditions may vary depending on the total order value, delivery destination and package weight.
Shipping Schedule and Delivery Time
In general, orders placed and confirmed between Monday and Friday, by 3:00 PM, are shipped within 48 hours of order confirmation. Orders placed on Friday after 3:00 PM, as well as those on Saturday and Sunday, will be shipped on Tuesday at the earliest. Any exception related to the delivery time will be communicated to the customer by phone or email by the sales representative.
Orders can be delivered exclusively within Romania. Confirmation of acceptance of delivery costs is made by mutual agreement between the customer and the sales representative, either by email or phone, regardless of the order value.
Payment Methods
- Payment by online bank card: Directly on the website, through a secure solution. All types of cards are accepted.
- Payment by bank transfer: Delivery will be made after confirmation of receipt of money in our account.
- Cash payment: Payment is made directly to the courier at the time of delivery.
Delivery Time
The standard delivery time is 1-4 business days from order confirmation, unless otherwise stipulated on the product page or on the order page.
Return Policy
Customers have the right to return the purchased products within 14 calendar days from the date of receipt, without giving a reason, according to the legislation in force. To initiate the return process, it is necessary to contact our sales representative by e-mail or phone.
Return costs:
- Return due to store error: If the return is caused by a store error (wrong, defective or not as described product), the return shipping fee is fully borne by GGLSALES.
- Return due to change of mind of the customer: If the customer decides to return the product for reasons other than those mentioned above (for example, changed his mind), the return shipping costs will be borne by the customer.
Conditions for accepting the return:
- Returned products must be in the same condition in which they were received: unused, without signs of wear, damage or modification, and together with all accessories and documents received (invoice, warranty certificate, etc.).
- If the products are unsealed, damaged, show signs of use or modification, we reserve the right to refuse the return or to deduct a percentage of up to 20% of the value of the product to cover the costs of reselling at a reduced price.
The refund of the amount paid will be made within 14 calendar days of receipt and verification of the returned product, using the same payment method used for the purchase, unless otherwise agreed.
Order Processing During Holiday Periods
During holiday periods (Easter, winter holidays), Black Friday and during other special campaigns, order processing and delivery may take between 7 and 10 business days.
feedback Report comment